NIT_83832

NIT NO.
NIT_83832
UNIT NAME
BHEL, PSER
ADDRESS
2ND FLOOR, BLOCK-DJ, PLOT-9/1, SECTOR-II, SALT LAKE CITY, KOLKATA-700 091.
EMAIL
anupriya.mundu@bhel.in, a_sarkar@bhel.in
TELEPHONE NO.
033-23398223 23398221 23211690
FAX NO.
033-23211960
APPROVED BY GM (SCT, PUR, COC, Commercial and Contract Closing)/PSER, GM (SCT, PUR, COC, Commercial and Contract Closing)/PSER
CONTACT PERSON ANUPRIYA MUNDU
NOTIFICATION NO.
PSER:PUR:SRG-S566:24 (ENQ:24:PP:0015:PUR:22)
PUBLISH DATE 12-07-2024
TENDER TITLE Package –I : Removal/Repair of defective furnace upper side (left, right and front) & intermediate fin weld panels and erection, testing and commissioning of newly supplied of same items along with accessories & hydro test of these new panels with connected other related circuits of Boiler including alignment, testing & welding / NDT of newly erected panels, Rear arch hanger inspection with proper approach, DP test of S/Z panel area & corrective measure i.e. replacement of damage tubes and welding of fins as required, Correction of critical piping support hot value along with approach (if required) at Unit#8, 2X660MW RRUVNL, Suratgarh Super Thermal Power Plant, Dist.-Sri Ganganagar, Rajasthan. & Package-II: Part I:"Transportation of material from store to Site, Erection, testing and commissioning of new pipe line between HPH-7 drain to HPH-6 & HPH-6 drain to deaerator” along with associated support & accessories like valve, NRV, Orifice etc. as directed by Engineer-in charge. Hydro test of these new lines with connected other related circuits of pipe & heater including alignment, testing & welding / NDT of newly erected pipes, at Unit#7&8, Part II: "Miscellaneous work for PG test of U#8 like Erection, alignment, welding & bolting of condensate pipe Flow nozzle, Erection & welding of impulse pipe at 140 location for PG test and other associated small work pertaining to PG test Applicable for U#8" at 2X660MW RRUVNL, Suratgarh Super Thermal Power Plant, Dist.-Sri Ganganagar, Rajasthan, complete as per the tender.
TENDER TYPE
Work Contract
TENDER DESCRIPTION Package –I : Removal/Repair of defective furnace upper side (left, right and front) & intermediate fin weld panels and erection, testing and commissioning of newly supplied of same items along with accessories & hydro test of these new panels with connected other related circuits of Boiler including alignment, testing & welding / NDT of newly erected panels, Rear arch hanger inspection with proper approach, DP test of S/Z panel area & corrective measure i.e. replacement of damage tubes and welding of fins as required, Correction of critical piping support hot value along with approach (if required) at Unit#8, 2X660MW RRUVNL, Suratgarh Super Thermal Power Plant, Dist.-Sri Ganganagar, Rajasthan.
&
Package-II: Part I:"Transportation of material from store to Site, Erection, testing and commissioning of new pipe line between HPH-7 drain to HPH-6 & HPH-6 drain to deaerator” along with associated support & accessories like valve, NRV, Orifice etc. as directed by Engineer-in charge. Hydro test of these new lines with connected other related circuits of pipe & heater including alignment, testing & welding / NDT of newly erected pipes, at Unit#7&8,
Part II: "Miscellaneous work for PG test of U#8 like Erection, alignment, welding & bolting of condensate pipe Flow nozzle, Erection & welding of impulse pipe at 140 location for PG test and other associated small work pertaining to PG test Applicable for U#8"
at 2X660MW RRUVNL, Suratgarh Super Thermal Power Plant, Dist.-Sri Ganganagar, Rajasthan, complete as per the tender.
TENDER VALUE
-
DOCUMENT VALUE
0
DATE OF NOTIFICATION 12-07-2024 05:41:44 PM
CLOSING DATE OF SALE FROM 16-07-2024 02:00:01 PM
CLOSING DATE OF SUBMISSION FORM 16-07-2024 02:01:01 PM
TENDER OPENING DATE 16-07-2024 04:30:01 PM
Download Full Details of Tender
Package –I : Removal/Repair of defective furnace upper side (left, right and front) & intermediate fin weld panels and erection, testing and commissioning of newly supplied of same items along with accessories & hydro test of these new panels with connected other related circuits of Boiler including alignment, testing & welding / NDT of newly erected panels, Rear arch hanger inspection with proper approach, DP test of S/Z panel area & corrective measure i.e. replacement of damage tubes and welding of fins as required, Correction of critical piping support hot value along with approach (if required) at Unit#8, 2X660MW RRUVNL, Suratgarh Super Thermal Power Plant, Dist.-Sri Ganganagar, Rajasthan. & Package-II: Part I:"Transportation of material from store to Site, Erection, testing and commissioning of new pipe line between HPH-7 drain to HPH-6 & HPH-6 drain to deaerator” along with associated support & accessories like valve, NRV, Orifice etc. as directed by Engineer-in charge. Hydro test of these new lines with connected other related circuits of pipe & heater including alignment, testing & welding / NDT of newly erected pipes, at Unit#7&8, Part II: "Miscellaneous work for PG test of U#8 like Erection, alignment, welding & bolting of condensate pipe Flow nozzle, Erection & welding of impulse pipe at 140 location for PG test and other associated small work pertaining to PG test Applicable for U#8" at 2X660MW RRUVNL, Suratgarh Super Thermal Power Plant, Dist.-Sri Ganganagar, Rajasthan, complete as per the tender. 7.21 MB

Back to previous page | Page last updated date : 15-07-2024