  • Erection, commissioning & Trial Operation including application of lining, Insulation, supply & touch-up painting as and where required including...

NIT_84693

यह पृष्ठ हिंदी में उपलब्ध नहीं है, कृपया अंग्रेजी में पढ़ने के लिए नीचे दिये गए लिंक पर क्लिक करें

Erection, commissioning & Trial Operation including application of lining, Insulation, supply & touch-up painting as and where required including Handling of materials at BHEL / Client's Stores / Storage Yard and transportation to site, and handing over of Electrostatic Precipitator (ESP) and its auxiliaries along with Ducting complete with all accessories, lining and insulation from ESP outlet to Chimney Inlet including supply & installation of items as per BOQ and FGD system and related auxiliaries along with the common system of Gypsum Dewatering System. E & C of Ducts of absorber, Absorber tower along with oxidation blowers, Lime Stone Handling System, including supply & installation of items as per BOQ of Unit#3 and Unit#4 of Stage#2 of 2X800 MW NTPC LARA Stage II Project, Dist. Raigarh, CG.

पिछले पृष्ठ मे वापस जाएं | पृष्ठ अंतिम अद्यतन तिथि : 02-09-2024