यह पृष्ठ हिंदी में उपलब्ध नहीं है, कृपया अंग्रेजी में पढ़ने के लिए नीचे दिये गए लिंक पर क्लिक करें
“ERECTION, TESTING & COMMISSIONING OF LTRH PENDENT COILS BANK, LTRH HORIZONTAL COILS BANK, ECONOMISER HORIZONTAL COILS BANK, LIFTING OF ECONOMISER OUTLET HEADER, SHORTENING OF LENGTH OF FSH REAR COIL ASSY. REMOVAL OF 02 INNERMOST ELEMENTS (ELEMENT NO-23 & 24) FROM EACH PLATEN SUPER HEATER ASSEMBLY, HEADER END PLUGS/BLANKED ARE TO BE INSTALLED, WELDED AT THE END OF HEADER NIPPLES OF PSH ALONG WITH CUP LOCK SCAFFOLDING ARRANGEMENT AND ERECTION & DISMANTLING UPTO BOTTOM OF PSH, ASSISTANCE IN SHOT PEENING OF FSH COILS ALONG WITH CONNECTED ACCESSERIES AND HYDRAULIC TEST OF THESE NEW COILS ALONG WITH OTHER RELATED CIRCUITS OF BOILER & CASTABLE REFRACTORY FOR EXTENDED BACK PASS PANEL INDLUDING ERECTION OF HP BYPASS LINE (1”, 70MTR) ALONGWITH REPAIRING ONSITE CUM RESTORATION OF PRESSURE PARTS COILS BY CUTTING, REMOVAL / OR CORRECTION OF DAMAGED COILS PRIOR TO ERECTION (SUCH AS BENDS, STRAIGHT TUBES INCLUDING HANGERS ETC.) WITH NEWLY SUPPLIED SPARES OF BHEL AT UNIT#03 OF 3X660 MW NPGCL STPP, NABINAGAR SITE, AURANGABAD (BIHAR)-824303”.